As mentioned in a previous blog entry, the beach renourishment in our area (a $ 2 million project) is finished. The renourishment this year only covered a couple of hundred yards south of the jetty, but did bring the "beach" back almost out to the 2007 renourishment levels. The chart shows the relative lattitude of the beach (X axis) as it corresponds to the dates listed on the Y axis. The photo shows the renourished beach from the perspective of the jetty boardwalk looking out to the "spur jetty". This project was not as extensive as the renourishment project in 2007, but every little bit helps when it comes to saving the beach line.